PROFILE
Engineer with 11 years experience, mainly in tunnel construction projects. I have extensive experience in manage construction projects. I have worked on major construction projects: Tunnel 42 Kms. for the subway in Barcelona, Tunnel for water supply project to the city of Barcelona, Tunnel for a High Speed Train project from Madrid to Valencia, Tunnel with Drill and Blast for a Highway in Barcelona. Great leadership skills and experience in management and organization of work teams. Experience in planning, logistics, in treatment with suppliers and clients. High knowledge of geology and material resistance. Experience in hydraulics, pneumatics, ventilation systems, pumping systems, mortar and concrete injection systems, mechanical and electrical installations and in preventive and corrective maintenance.
WORK EXPERIENCE
COMPANY: OHL.
09/10- Actually. Machinery and Equipment Manager. Water Siphon Tunnel New York. EPB TBM tunnel project in soft ground conditions under the Hudson river.
04/08- 09/10. Tunnel Engineer.
- TUNNEL LINE 9. Tunnel for the SUBWAY in Barcelona (Spain).
Tunnel Ø=10,8Kms. L=42Kms. TBM EPB. Manufacturer: NFM.
- TUNNEL TRINITAT. Water supply project to the city of Barcelona (Spain).
Tunnel Ø=6m L=6Kms. TBM Double Shield. Manufacturer: HERRENKNECHT
- Testing the TBM in the manufacturer factory.
- Coordination of transportation of the TBM from Germany to Spain.
- Assembly, execution of the tunnel of 6Kms in 10 months, and TBM disassembly.
- Conveyor belt system installation, hydraulic installations, ventilation systems, elevators installations, pipes, pneumatic, electric and mechanical installations.
- Maintenance preventive and corrective of the TBM, trains, conveyor belt and all the installations.
- Store management.
06/05- 04/08 COMPANY: FCC.
- TUNNEL SIETE AGUAS – BUÑOL. HIGH-SPEED TRAIN Madrid-Valencia (Spain). Project Engineer. Project for the tunnel construction. Based on data provided by the geologists and in coordination with engineers from the manufacturer of the TBM is determined by the method of construction of the tunnel and the type of TBM to be used. The project and cost studies for the purchase of the TBM. Manufacturer: HERRENKNECHT
- HIGHWAY Barcelona-Olot (Spain). Construction of tunnel with Drill and Blast. Production department.
- TUNNEL LINE 9. Tunnel for the SUBWAY in Barcelona (Spain). Shift Tunnelling Engineer. L=8Kms.
05/03- 06/05 COMPANY: GROUP BOUYGUES.
Site manager in several building constructions for several public agencies:
- Historical Archive.
- Primary school education center.
- 24 industrial buildings.
06/02- 05/03 DELPHI AUTOMOTIV...
Login or Register to view the full resume.